Roofer with a moisture meter inspecting a roof while the owner takes notes

Rust, Seams, Permits, And Weather

Covington Metal Roof Coating Questions

Straight answers to metal roof coating questions from Covington building owners, from rust and screws to permits and river weather.

Metal roof coating is a fluid-applied membrane rolled or sprayed over an existing metal roof to seal seams, fasteners and rust and to reflect heat. Covington Metal Roof Coating coats commercial metal roofs and offers silicone, acrylic, spray foam and shingle roof coating in Covington, Kenton County, Kentucky, and nearby river cities.

Jump to a topic, or call (859) 204-8065 with a question about your own roof.

Metal Roof Coating Basics

What does a coating actually do for an old metal roof?

A coating adds a continuous, rubbery membrane over the panels that blocks water at the weak points of a metal roof and slows further corrosion. Most leaks on a metal building start at fasteners, panel laps and flashing, and the coating system reinforces those spots before the field of the roof gets its full coat.

The finished roof keeps its original panels, so the building stays dry while the crew works. A light-colored top coat also turns sunlight away from the steel, which keeps the roof deck cooler on summer afternoons. The panels underneath still carry the structural load; the coating protects their surface and their joints.

Which commercial metal roofs make good coating candidates?

Metal roofs with solid panels, surface rust and leaking fasteners are the best coating candidates. Warehouses, shops, agricultural barns, churches and older industrial buildings with R-panel or standing seam roofs all fit when the steel still holds a screw firmly.

Roof signCoat itRepair firstReplace the panel
Faded finish, light chalkingYesNoNo
Rust bloom on panel facesYes, after treatmentWire brush and primeNo
Rust holes at panel endsAfter repairPatch or swapOften
Panels that flex underfootNoCheck purlinsYes

Panels with holes you can see daylight through, or decking that sags at the eaves, need repair or replacement before coating starts.

Can a white coating cut heat on a metal roof?

Reflective white coatings bounce much of the sun's energy away from the roof surface, so the steel under them runs cooler than a dark or rusted panel. That lower surface temperature can reduce heat flow into an uninsulated warehouse or shop on hot days.

The Cool Roof Rating Council lists tested products with their solar reflectance and thermal emittance, both when new and after three years of weathering. Comparing those rated values is more reliable than marketing claims on a pail label.

Dirt, foot traffic around rooftop units and soot near loading docks lower reflectance over time. A rinse during routine roof checks helps the surface keep more of its rated performance, especially around curbs and exhaust fans where grime builds up first.

Rust, Fasteners and Seams

Can you coat over rust on a metal roof?

Light surface rust can be coated once it is cleaned and treated with a rust-inhibiting primer. Loose scale has to come off first, because coating stuck to flaking rust lifts when the flakes let go.

  • Red rust on bare steel gets wire brushing or grinding, then a rust primer.
  • White rust on galvanized gutters and panels is zinc oxide; it gets cleaned and primed with a product made for galvanized steel.
  • Rust bloom around fastener heads gets treated along with the screw.

Panels rusted through at end laps or eaves are cut out or replaced. Coating cannot close a hole in the steel by itself, so those spots get a metal patch before any membrane goes on.

What happens to loose or backed-out roof screws?

Every fastener on an exposed-fastener roof gets checked, and loose or stripped ones are tightened, replaced with an oversized screw, or both. Thermal movement works screws loose over the years, and the rubber washer under each head dries and cracks in the sun.

After the screws are set, each head is sealed. Crews use a brush-grade sealant or a fastener cap so the washer no longer has to keep water out on its own. On a large R-panel warehouse, that can mean thousands of screws, which is a big part of the labor.

Missing fasteners along ridge caps and eave trim get added. Those edges catch the most wind uplift, and a loose ridge cap is a common source of leaks after a storm.

How are panel laps and seams sealed before coating?

Side laps and end laps get cleaned, then sealed with a reinforced seam treatment before the field coat goes on. That usually means a layer of coating, a strip of polyester fabric or seam tape pressed into it, and a second layer over the top.

End laps matter most on long, low-slope runs. Water creeps uphill between overlapping panels by capillary action, and that is where many interior drips start. Old butyl tape that has slumped or hardened is scraped back where it blocks a clean bond.

Standing seam roofs get the same attention at the seam clips and end laps, plus any spots where earlier repairs used caulk that has since cracked.

Is prep different for standing seam and exposed-fastener roofs?

Prep differs mainly in where the leaks hide. Exposed-fastener R-panel roofs leak at thousands of screws, while standing seam roofs leak at end laps, penetrations and failed sealant along the seams.

Prep itemExposed-fastener (R-panel)Standing seam
Fastener workTighten, replace, seal every screwFew exposed screws, mostly at trim
Seam treatmentSide laps and end lapsEnd laps and seam ends
Common leak pointsWashers, laps, skylight panelsPenetrations, ridge, eave closures
Movement concernScrew back-outPanel expansion at clips

Standing seam panels move along their length, so seam treatments are kept flexible and clear of the clips that let the panels slide. Both types get pressure washing and rust treatment the same way.

What about skylight panels, ridge caps, gutters and curbs?

Every roof detail gets its own treatment before the field coat, because detail areas leak first. Translucent skylight panels can be coated over to stop leaks, but that blocks their light, so many owners replace cracked or yellowed ones instead.

  • Ridge caps get fastener checks and seam treatment where they meet the panels.
  • Gutters with white rust get cleaned, primed and coated inside where the metal is sound.
  • Curbs under rooftop units and vents get flashing reinforced with fabric at the corners.
  • Pipe boots that have split are replaced rather than buried under coating.

Ponding at a sagging gutter or a blocked downspout is cleared during prep so water drains off the finished roof.

Choosing a Coating System

Silicone or acrylic for a commercial metal roof?

Silicone handles standing water and weathering better, while acrylic costs less per gallon and suits well-drained, steeper metal roofs. Both come in white and light colors, and both need the same fastener, seam and rust prep.

FactorSiliconeAcrylic
Ponding waterTolerates itSoftens under it
Dirt pickupCollects more grimeStays cleaner
Recoat laterNeeds silicone over siliconeAccepts acrylic recoats easily
Cold-weather applicationWider temperature windowNeeds warmer, dry days
Best fitLow-slope panels, flat spotsPitched panels that shed water fast

Some metal roofs get an acrylic primer layer with a silicone top coat. The product choice comes from the slope, drainage and the plan for future recoats.

Which coating works where water ponds near gutters or low spots?

Where water sits on a metal roof after rain, silicone is the usual pick because it resists breakdown under standing water. Ponding on metal roofs often shows up along sagging gutters, behind rooftop units, and where purlins have deflected on long low-slope runs.

Before any coating goes on, the cause of the ponding gets checked. A clogged gutter or crushed downspout is a simple fix. A dip caused by a bent purlin or a heavy unit on an undersized curb is a structural item for the owner and an engineer.

Coating does not correct drainage. It protects the surface while the water evaporates, and the roof still benefits from fixing the low spot if the framing allows.

Can spray foam go over an existing metal roof?

Spray polyurethane foam can be applied directly over metal panels to fill the corrugations, add insulation and form one continuous surface, then it gets a coating on top for UV protection. Coating alone keeps the existing profile and adds no insulation.

QuestionSpray foam plus coatingCoating only
Insulation addedYes, by foam thicknessMinimal
Changes roof profileFills ribs, smooths surfaceKeeps panel ribs
Leak points coveredLaps and screws buried in foamLaps and screws sealed one by one
Weight and edge workMore trim and edge detailLittle change at edges
Ideal buildingUninsulated warehouse or shopInsulated building with sound panels

Foam adds height at the eaves, so gutter lines, drip edges and wall flashing get adjusted.

Can you coat an asphalt shingle roof on a commercial building?

Some shingle coatings are made for commercial asphalt shingle roofs on strip centers, offices and churches, but they only work on shingles that still lie flat and hold their granules. Curled, cupped or missing shingles need repair or replacement first.

Two limits matter here:

  • Manufacturer approval of the shingle coating for the specific shingle type on the roof.
  • Ventilation and moisture in the attic or deck, because a coating holds water in if the deck underneath stays damp.

A shingle roof check looks at granule loss in gutters, exposed fiberglass mat, lifted tabs at ridges and valleys, and soft decking. Many commercial shingle roofs end up as repair-and-coat candidates on one slope and replacement candidates on another.

Northern Kentucky Weather and Roofs

How do Northern Kentucky winters and summers affect a coated metal roof?

Metal roofs in the Covington area swing between hot summer afternoons and freezing winter nights, so the coating has to stretch and recover as the panels expand and contract. Elastomeric coatings are built for that movement, which is why seam and fastener reinforcement matters more than coating thickness alone.

Winter brings snow and ice that sit at eaves and in gutters. Ice dams at the eave trim push meltwater back under end laps, so those laps get reinforced fabric. Snow guards and ridge vents get sealed at their fasteners as well.

Summer humidity along the Ohio River valley leaves heavy dew on the roof most mornings. Crews wait for panels to dry before priming or coating, so work starts after the dew burns off.

What do hail and summer storms do to a coated metal roof?

Hail dents metal panels and can puncture a thin coating at raised ribs and seams. A dented roof with intact steel is still a coating candidate after the owner settles any insurance claim on the dents.

Northern Kentucky forecasts and severe thunderstorm warnings come from the National Weather Service office in Wilmington, Ohio. After a strong storm, a walk-through looks for:

  • Lifted ridge caps and loose eave trim.
  • Punctures at rib tops and around skylight panels.
  • Debris in gutters and valleys that can hold water.
  • Torn sealant at curbs and pipe flashing.

Small coating punctures are repaired with the same product, cleaned and patched with a lap past the damage.

Does Ohio River flooding change roof work near the riverfront?

Roof coating itself sits well above flood level, but river rises affect access, staging and timing for buildings near the Covington and Newport riverfront. The City of Covington installs floodgates in openings of its floodwall when the Ohio River rises, which can close streets that crews and material trucks use.

For riverfront warehouses and older commercial buildings, the job plan sets lift and material staging on paved, high ground and allows time if a gate closes a route. After high water, crews check roof drains, scuppers and downspouts for silt or debris before testing drainage on the finished roof.

Question About Your Own Roof?

Call and describe the roof, the leaks, and the building. We answer what we can on the phone and set up a walk for the rest.

Prep, Application and Downtime

What are the steps in a metal roof coating job?

A metal roof coating job runs in a fixed order, starting with an inspection and ending with a final walk of every seam and detail.

  • Inspect your roof. Check panels, fasteners, laps, flashing, gutters and the deck from inside where possible.
  • Wash. Pressure wash to remove chalking, dirt, moss and loose paint.
  • Treat rust. Brush or grind red rust, then prime bare and galvanized steel.
  • Fix details. Set and seal fasteners, reinforce laps, flash curbs and replace bad panels.
  • Coat the field. Spray or roll the base and top coats to the specified thickness.
  • Walk it. Check thickness with a gauge, touch up thin spots and clear gutters.

Each step has to dry or cure before the next, which sets the pace more than crew size.

Can the building stay open while the roof is coated?

Most businesses stay open during a metal roof coating job, since the work happens on top of the existing panels and nothing is torn off. Inside, staff usually notice foot traffic noise, some wash water at gutters and a coating odor near rooftop air intakes.

Planning covers a few items:

  • Air intakes on rooftop units get closed or covered while spraying nearby.
  • Parking next to the walls is cleared when spraying in wind.
  • Entrances under the eaves get a safe route away from overhead work.
  • Loading docks stay in use with scheduled pauses for lifts.

Owners of food plants, clinics or other odor-sensitive spaces talk through timing so the work near intakes lands on off-hours.

What weather does a crew need to apply coating?

Coating goes on when the metal is clean, dry and warm enough for the product, with no rain expected before the surface skins over. Each manufacturer prints minimum surface and air temperatures plus dew point limits on its data sheet, and crews follow those numbers.

In Kenton and Campbell counties, the main schedule factors are:

  • Spring rain that stops work for a day of drying.
  • Morning dew on panels near the river.
  • Late fall nights that drop near freezing before acrylic can cure.
  • Summer heat that makes steel too hot to touch, so crews start early.

Silicone allows a wider weather window than acrylic, which is one reason it gets picked for late-season jobs. Rust primers have their own recoat times printed on the label.

Cost, Value and Taxes

What drives the cost of coating a commercial metal roof?

Square footage sets the base, but the condition of fasteners, seams and rust usually moves the total more than roof size. Two warehouses with the same footprint can differ widely once the screw count and rust treatment are tallied.

Main cost drivers:

  • Fastener count and how many screws need replacing.
  • Rust level, from light bloom to panels that need patches.
  • Seam length of side laps and end laps to reinforce.
  • Coating type and the number of coats.
  • Access, including lift rental, roof height and slope.
  • Details such as skylight panels, curbs, gutters and pipe boots.

Spray foam adds material and edge work. A clean, tight roof with few penetrations costs the least per square foot.

Should I coat, restore, re-panel or replace my metal roof?

The right choice depends on how much of the steel is still solid. Coating fits roofs with surface rust and leaks at joints; full replacement fits roofs where the panels or framing have failed.

OptionWhat it involvesFits when
CoatClean, prime, seal details, coat the fieldPanels solid, rust on surface only
RestoreCoating plus panel patches and fastener replacementScattered rust holes and many loose screws
Re-panelNew metal over the old roof or on purlinsWidespread rust-through, framing intact
ReplaceTear off panels, repair framing, new roofBent purlins, deck failure, structural damage

Probing panels with a screwdriver and checking steel thickness at rusty eaves and end laps shows which column a roof falls in. Many roofs mix restore and re-panel zones.

Does Section 179 apply to a commercial roof coating project?

Roofs on existing nonresidential buildings can qualify for the Section 179 deduction as qualified real property improvements, according to IRS Publication 946. For tax years beginning in 2026, the deduction limit is $2,560,000, and it phases out once qualifying property placed in service exceeds $4,090,000.

A few points to raise with a CPA:

  • Building type matters, since residential rental property is excluded.
  • Timing depends on when the roof work is placed in service.
  • Classification of a coating as a repair or an improvement changes the treatment.

Keep invoices that describe the roof work, including fastener replacement, seam treatment and coating, so the accountant can sort repair costs from improvements.

Permits, Codes and Utilities

Who issues building permits for roof work in Covington and nearby cities?

Permit offices split along the Licking River, with Kenton County cities on the west side and Campbell County cities on the east. The Kentucky Department of Housing, Buildings and Construction publishes county contact sheets for Kenton County and Campbell County that list the local building office for each city.

CityCountyBuilding permits and inspection
CovingtonKentonPlanning and Development Services of Kenton County, after a city zoning permit
LudlowKentonPlanning and Development Services of Kenton County
NewportCampbellCity of Newport building inspector
BellevueCampbellCampbell County building inspection office
DaytonCampbellCampbell County building inspection office
Fort ThomasCampbellCampbell County office; city contact listed for single-family work
SouthgateCampbellCampbell County building inspection office

Whether a coating needs a permit is a question for the office in the table. Panel replacement, structural repairs at purlins and new rooftop curbs are the items most likely to trigger review.

What role does the state play in commercial roof permits?

The Kentucky Department of Housing, Buildings and Construction oversees the state building code and lists state contacts for each county alongside the local offices. The Campbell and Kenton county sheets include a state building inspector and a Northern Kentucky plan review contact.

Local offices handle most routine commercial work in these cities. Larger projects, such as re-panel jobs that change framing or add spray foam with new edge metal and parapet flashing, are the kind of scope to raise with the local office early so it can say whether state plan review applies.

Keep the permit card and any inspection sign-offs with the roof records. A future buyer, lender or insurer can ask for proof that panel and framing repairs were inspected.

Can a reflective coating qualify for a Duke Energy Kentucky rebate?

Rebate offers change, so check Duke Energy Kentucky's current business programs before counting on one. Duke Energy Kentucky provides electric service across much of Northern Kentucky, including the river cities around Covington, but the electric bill confirms the provider for a specific building.

A white coating mainly lowers cooling demand in spaces under the roof that are air conditioned. An uninsulated warehouse with only exhaust fans sees comfort gains near the roof deck, while an office or retail space with rooftop units sees the effect on its electric bill.

Useful records for any utility program include the coating product name, its Cool Roof Rating Council listing, the roof square footage and photos of the rooftop units and curbs before and after the work.

Questions by Town

What permit steps apply to coating a metal roof in Covington?

Covington requires a city zoning permit before Planning and Development Services of Kenton County issues a building permit. That order comes from the city's own permit guidance, so a Covington roof job checks with the city first, then with PDS.

For a straight coating over existing panels, the city and PDS decide whether a permit is needed at all. Scope that adds or changes something tends to draw review:

  • New rooftop curbs for added HVAC units.
  • Replaced panels over rusted purlins.
  • Spray foam that raises the roof edge and changes fascia trim.

Sorting this out before the lift arrives keeps a Covington warehouse or shop roof on schedule.

Does a Covington historic overlay affect coating a visible metal roof?

Properties inside a Covington Historic Preservation overlay need a Certificate of Appropriateness from the city's Historic Preservation Officer before zoning review. The city publishes a map to check whether an address falls inside an overlay, along with a historic design guide and a historic preservation page.

Low-slope metal roofs hidden behind parapets on commercial blocks rarely show from the street. Pitched standing seam roofs, metal porch roofs and ridge caps that face the sidewalk are a different matter, since a bright white coating changes how they look.

Owners of overlay buildings ask the Historic Preservation Officer about color before ordering material. A darker or matching coating color is one way to keep a visible metal roof face close to its existing appearance.

Can coating help a Ludlow building with a code enforcement notice about its roof?

Ludlow runs its own code enforcement department, and a notice about rusted roof panels, loose gutters or failing flashing can often be answered with repair plus coating. The notice wording tells you exactly which items the city wants corrected.

Items that often show up on a metal building:

  • Rusted gutters pulling away from the fascia.
  • Loose trim at the eave or rake edge.
  • Faded, peeling panels facing the street.

Repairs come first, then coating over the repaired areas so the fix lasts. Building permits for Ludlow go through Planning and Development Services of Kenton County, so any panel replacement gets checked with PDS as well as the code enforcement officer.

Is the permit path in Ludlow the same as in Covington?

Both Ludlow and Covington use Planning and Development Services of Kenton County for building permits, according to the state contact sheet for Kenton County. The difference is the city step in front of it.

Covington's own guidance requires a city zoning permit first. A Ludlow property owner checks with Ludlow city offices for any local step before PDS, since each Kenton County city sets its own zoning process.

Ludlow sits on the Ohio River west of Covington. For a riverside metal building there, describe any work at parapet walls, scuppers or roof drains clearly to PDS so the reviewer sees the full scope.

Who handles commercial building permits in Newport?

Newport has its own city building inspector, separate from the Campbell County office that covers several neighboring cities. The state contact sheet for Campbell County lists Newport on its own line, and the city posts building permit FAQs.

A Newport roof coating job checks with the city building office first. Scope details that help the conversation:

  • Panel replacement count and locations.
  • Rooftop unit work, including new curbs or relocations.
  • Fall protection and lift placement on city sidewalks or streets.

A lift parked on a Newport street or sidewalk can also need city right-of-way permission, so ask the building office who handles that.

Do Newport's historic districts regulate roof coating?

Roofs visible from the street or sidewalk are regulated in Newport's East Row and York Street local districts and on individual landmarks, and roofs with street frontage in the Buena Vista district. A Certificate of Appropriateness from the Historic Preservation Officer covers exterior work there, as the city's guide to the COA process explains.

The officer approves projects that meet Newport's design guidelines, and others go to the Historic Preservation Commission at its monthly meeting. Routine maintenance with no change in appearance falls outside the review.

A metal roof coating that keeps a visible standing seam or ridge cap the same color is closer to maintenance. Switching a dark visible roof to bright white is a change in appearance, so ask the officer first.

Who inspects a commercial roof project in Bellevue?

Bellevue roof work goes through the Campbell County building inspection office, which the state contact sheet lists for Bellevue. The city sits on the Ohio River between Newport and Dayton.

Where a Bellevue commercial building shares a wall with its neighbor, the coating plan covers:

  • Party walls between buildings need flashing checks where one roof meets the next.
  • Overspray control matters with neighbors a few feet away, so rolling replaces spraying near the edges.
  • Lift access often depends on rear alleys or side lots.

Before work starts on a shared-wall building, the owner lets the neighbor know about crew access and noise.

How does river-valley moisture affect coating a Bellevue metal roof?

Bellevue's riverfront location brings morning fog and heavy dew that leave panels wet until midmorning. Coating needs a dry surface above the dew point, so start times shift with the weather.

Moisture also feeds white rust on galvanized gutters, downspouts and panel edges facing the river. During prep, crews:

  • Scrub white rust off zinc-coated metal.
  • Prime with a product made for galvanized steel.
  • Seal end laps where dew collects and wicks uphill.

Wind off the river also carries overspray farther than on inland sites, so Bellevue jobs plan roller and brush work around edges facing the street or neighbors.

Is Dayton, Kentucky roof work handled by Dayton, Ohio offices?

Dayton, Kentucky is a Campbell County river city east of Bellevue, and its building permits go through the Campbell County building inspection office. Dayton, Ohio sits about an hour's drive north and plays no part in Kentucky permits.

The name mix-up shows up in online searches for contractors, product suppliers and code offices. When checking codes or permits for a Dayton, Kentucky metal building, look for Kentucky and Campbell County sources only.

Kentucky follows its own state building code through the Department of Housing, Buildings and Construction. Ohio rules for roof work, fasteners or coatings have no bearing on a roof here, even when a supplier or online listing shows an Ohio address.

What should Dayton building owners check about flooding before roof work?

Along the Ohio River in Dayton, owners of low-lying commercial lots check flood history and the property's flood zone before planning staging. The roof itself stays high and dry, but the ground under the lift may be soft after high water.

Planning points for a riverfront Dayton job:

  • Staging on paved, high ground away from low spots.
  • Timing that avoids weeks when the river is rising.
  • Drain checks at downspouts and scuppers for silt after floods.

Flooding can also back up storm lines, so roof drains that tie into underground pipe get checked after the water drops to confirm they flow before the gutters get coated.

Who handles a commercial roof permit in Fort Thomas?

The state contact sheet lists the Campbell County building inspection office for Fort Thomas, and it lists a separate city contact for single-family dwellings. A commercial metal roof in Fort Thomas falls on the commercial side of that split.

Owners of churches, schools, offices and retail buildings in Fort Thomas confirm with both the city and the county office which one reviews their roof scope. Items that tend to need review include:

  • Structural repairs to purlins or decking.
  • Spray foam that changes edge height.
  • New penetrations for rooftop equipment.

The city contact still helps with local rules on work hours, parking and lift placement next to commercial lots.

Does Fort Thomas's hilltop setting change a coating plan?

Fort Thomas sits on high ground above the Ohio River, and roofs on exposed hilltops catch more wind than buildings down in the river valley. Wind affects both the roof and the work.

On the roof, wind loads concentrate at corners, rakes and ridge caps, so those fasteners get extra attention. Loose eave trim and lifted ridge caps get refastened before coating.

During the work, gusts carry spray mist, so crews switch to rollers on windy days and protect parked cars and nearby walls. Skylight panels and roof hatches on the windward side get covered before any spraying starts.

Does a Southgate building away from the river face the same flood issues?

Southgate sits inland and uphill from the Newport riverfront, so river flooding plays little role in planning a roof job there. Drainage on the roof and around the building matters more.

Southgate roof checks focus on:

  • Gutters sized for the roof area and kept clear.
  • Downspouts that discharge away from foundations and parking.
  • Ponding at sagging gutters or behind rooftop units.
  • Slope on low-pitch metal panels that hold water near the eaves.

Stormwater from heavy rain moves fast on sloped lots, so downspout extensions and splash blocks get checked as part of the roof work.

Which office inspects a Southgate roof project?

Campbell County's building inspection office handles Southgate building work, according to the state contact sheet. The same sheet lists a state Northern Kentucky plan review contact.

For a Southgate shopping center or office with a large metal or low-slope roof, ask the county office early whether the scope needs state plan review. Spray foam with new edge metal, re-panel work and added rooftop equipment are the items to describe.

A clear scope sheet helps the reviewer:

  • Roof area and panel type.
  • Repairs planned at purlins, decking or curbs.
  • Coating system and any spray foam thickness.

Getting Started

What should I gather before a metal roof inspection?

Roof history and a list of leak spots make the first inspection faster and more accurate. Interior stains often sit downhill from the real entry point, because water runs along purlins before it drips.

Helpful items to have ready:

  • Leak locations marked on a floor plan, with dates.
  • Past repairs, including caulk jobs at skylight panels or ridge caps.
  • Building drawings that show panel type and roof slope.
  • Insurance notes on any hail claim and its status.
  • Access details for the roof hatch, ladder or lift area.

Photos of ceiling stains and wet spots after rain help match inside damage to roof details outside.

What happens after the roof inspection?

After the inspection, the owner gets a plain summary of the roof's condition and which path fits it, from coating alone to restore, re-panel or replace. Photos tie each finding to a spot on the roof, such as a rusted end lap, a split pipe boot or a ponding gutter.

From there, the next steps are:

  • Choose the coating system and any spray foam.
  • Confirm permit needs with the city or county office.
  • Schedule around weather, operations and rooftop unit service.
  • Plan access, staging and protection for cars and entrances.

Owners who want to see the color and finish first can ask for a small test patch on a rooftop corner before the full coat.

Still Have A Roof Question?

Get a ballpark range for your roof size, or call to ask about your building.

Call UsGet A Free Estimate